Cyclotron Images: Photos by Mike Campbell 2015 Forming the trenches 2015 – Installing drywall 2015 Bunker construction Floor plan of Cyclotron & Radiopharmacy Facility 2015 Bunker door rails 2015 Target at factory in BC 2014 – Bunker door frame at factory in Italy 2015 Installation of bunker wall and door way 2015 Framing of bunker hatch 2015 Scaffolding to install lead bricks 2015 Bunker under construction 2015 Installation of Research Lab hot cells (back view) 2015.02. Cyclotron equipment crated and loaded at ACSI factory in Richmond, BC 2015 Pouring concrete 2015 Installation of meeting room 2015 – Delivering concrete 2015.02.10 Arrival of TR-24 Cyclotron 2015 Installation of cupboards in shipping area 2015.02.10 The TR-24 Cyclotron arrived in the early hours of the morning via transport truck from Vancouver, BC 2015 – Looking toward bunker space 2015 Sheets of radiation shielding polyethylene 2015 Moving the door frame towards bunker hatch 2015.03.10 Mark Henderson – Exceptional Cancer Care Campaign media event 2015.02.10 TR-24 Cyclotron unpacked and in its new home 2015.02.10 View through the ceiling hole up to the crane 2015.10.14 QC equipment installed – High-Performance Liquid Chromatography (HPLC) Area radiation monitor 2015 TR-24 Cyclotron at factory in BC 2015 Mrs. Campbell visits the facility 2015 Bunker roof 2015 View of bunker hatch from below 2015.02 Cyclotron equipment leaving factory and starting its journey from BC to Ontario 2015 Framed walls 2015 Pouring the concrete – an all day affair! 2015 Building under construction 2015 Framed walls – looking down Hot Corridor 2015 Installation of bunker door and frame 2015.03.10 Keith Jobbitt – Exceptional Cancer Care Campaign media event 2014 – Research Lab hot cells at factory in Italy 2015.02.10 Uncrating the TR-24 Cyclotron 2015.02.10 Lowering of the Water Pak through the delivery hatch in the shipment room 2015 Bunker construction 2015 Smoothing the concrete of the bunker roof 2015 Mike Campbell (TBRRI) & Branislav Kovac in front of cyclotron at factory 2015 Pass-throughs in production anteroom 2015 Installation of bunker door rails 2015.03.10 Don Paterson, Exceptional Cancer Care Campaign media event 2015 Building under construction 2015 Building under construction 2015 Perspective of size of bunker 2014 – PERS Lab Hot Cells at factory in Italy 2015 Hot cell framework 2015 View from inside of bunker looking out doorway 2015 Pouring the concrete 2015.02.10 TR-24 Cyclotron unpacked and in its new home 2015 Cyclotron equipment ready to be shipped 2015 Trench in floor Robotic arm of the dispensing hot cell 2015 Pouring concrete 2015 – Framing of trench 2015 Building under construction 2015 Lead door and lead glass on hot cell 2015 Mike Campbell (TBRRI) & Branislav Kovac (ACSI) in front of cyclotron at factory 2015 Building under construction 2015 Installation of bunker door 2015 Installation of bunker door 2015 Cyclotron equipment ready to be shipped 2015 Research Lab construction 2015 Research Lab painting completed 2015.02.10 The crane getting ready for the delivery 2014 – Gas holding tanks at factory in Italy 2015 Installation of hot cell in Research Lab 2015 Bunker roof Liquid target system 2015.10.14 QC equipment installed – Gas Chromatography (GC) 2015.02 Cyclotron equipment being packaged up at factory in Richmond, BC 2015 TR-24 Cyclotron under construction at factory in BC 2015.02.10 Uncrating the cyclotron parts 2015 03.10 Exceptional Cancer Care Campaign media event 2015 Half of cyclotron at factory in BC 2015 Tag team of concrete mixers 2015 RF Electrical Cabinets ready to be shipped from factory 2015 TR-24 Cyclotron open for maintenance and showing ion source below and beam line to right 2015 Installation of lead bricks in wall above bunker 2015.02 Unpacking the cyclotron 2015.03.10 Don Paterson, Exceptional Cancer Care Campaign media event 2015 Looking into the centre of the cyclotron 2015.02. TR-24 Cyclotron crated and loaded on transport at factory in Richmond, BC 2015.02.10 Equipment arriving by transport truck 2015 Water Pak equipment at factory in BC 2015 Pallets of lead bricks shipped from Italy 2015 Bunker construction 2015 Clinical production lab synthesis and dispensing hot cells 2015 Bunker construction 2015 Installation of lead door on hot cell 2015 TR-24 Cyclotron at factory in BC 2014 – Gas holding tank power and controls 2014 – Bunker frame and door at factory in Italy 2015 Bunker door controls 2015 Close up of Cyclotron innards 2015 Looking through a beam line hole in the concrete at the cyclotron 2015 Platform to reach tech space and Research Lab entries from Equipment Room 2015 Starting work in the bunker 2015 Moving bunker door to hatch 2015 – Framing of trenches 2015 – Working on the bunker 2015 TR-24 Cyclotron shown open for maintenance 2015 Freshly poured concrete floor Shipping crate used to ship radiopharmaceuticals – weighs about 29kg! 2015 Bunker door lights 2015 Installation of hot cells in Research Lab 2015 Installation of bunker door rails 2015 – Trenches formed in concrete floor 2015.02.10 Ceiling plug installed in the bunker after cyclotron delivery 2015.08.17 Our first F-18 was produced! 2015 Temporary cover for hole in bunker ceiling 2015 TR-24 Cyclotron at factory in Richmond, BC 2014 – Bunker door at factory in Italy 2015 Inside the bunker during construction 2015 Ceilings drywalled 2015 Bunker construction 2015 – Delivering concrete to the Equipment Room 2015 Bunker construction 2015 Installation of telemanipulators in SPECT lab of Clinical Production area 2015 Beam lines being constructed at factory in BC 2015 Equipment Room showing high-voltage power supply cabinets and bunker door 2015 Equipment under construction at factory in BC 2015 Equipment under construction at factory in BC 2015 Installation of gas holding tanks 2015 Showing rebar of the bunker walls and ceiling during concrete pour 2015 Pouring concrete 2015 Installation of bunker door and door frame 2015 Installation of hot cell in Research Lab 2015.02.10 Removing temporary lid from bunker hole 2015 Inside the bunker framework 2015 – The bunker hole 2015 Artist’s drawing of the building showing the facility in the basement 2015 – Digging out the bunker location 2015 – Pouring Equipment Room concrete floor 2015.02.10 Preparing to lift the cyclotron by crane Solid target apparatus 2015 Bunker door system installed 2015.10.14 QC equipment installed – Radio-TLC Detector 2015.02.10 Arrival of cyclotron equipment 2015.02.10 Lowering the TR-24 Cyclotron into place 2015 – Pour of Equipment Room floor completed 2015.08.17 Our first F-18 produced – 382 GBq! 2015 – Facility construction 2015 Framing of bunker 2015.02.10 TR-24 Cyclotron unpacked and in its new home 2015 – Framing of walls 2015.02.10 Lifting the TR-24 Cyclotron by crane 2015 Electrical panels for hot cells 2015.02.10 Installation of bunker ceiling plug Lead-covered transfer pipes in the floor 2015 Delivery trenches in concrete floor 2015.02. TR-24 Cyclotron crated and ready to be shipped via transport from factory in Richmond, BC Hot cell control panel 2015 – Bunker hole 2015 Ready to paint 2015 – Delivering concrete 2015 Arrival of heavy equipment through delivery hatch in shipping area 2015 Installation of telemanipulators for hot cell in Research Lab 2015 – Pouring concrete in the Equipment Room 2015 Arrival of gas holding tanks 2015.10.27 Dispensing Hot Cell 2015 Newly finished floor in Hot Corridor 2015 – Amanda Moen watching the progress 2015 Bunker under construction 2015 – Framing trenches 2015 Painting the Equipment Room floor 2015 Installation of SPECT Lab hot cells in Clinical Production area 2015 Equipment at factory in BC 2015 Lead brick shielding